To view graphic version of this page, refresh this page (F5)

Skip to page body

Major Environmental Analysis



Program Overview

General CEQA Projects

SFPUC CEQA Projects

Categorical Exemption Determinations

Area Plan EIRs

RFQs and RFPs

Consultant Resources


MEA - General Project CEQA Documents

Below are recent CEQA documents and notices for non-SFPUC projects, the date of the most recent publication, and the MEA contact person assigned to the project. Most recent documents are posted on top. Documents are in PDF format. Final EIRs for adopted area plans may be found under Area Plan EIRs. For information on MEA projects not listed below, please call 415 575-9025.

We welcome your feedback on this web page. Please email your comments to the MEA webmaster at jeanie.poling@sfgov.org

 

Case # Project Name and Document Updated MEA Contact
2007.1238E San Francisco Better Streets Plan
Notice of Availability and Preliminary Mitigated Negative Declaration
 
7/28/10 Monica Pereira
575-9107
2008.0797E 235 Broadway
Final Mitigated Negative Declaration
 
7/22/10 Jeanie Poling
575-9072
2008.1052E 429 Amador Street (Pier 94) Darling Biodiesel Facility
Addendum to Supplemental Environmental Impact Report
 
7/22/10 Don Lewis
575-9095
2005.0555E

California Pacific Medical Center (CPMC) Long Range Development Plan
NOTE: A public hearing on the project’s Draft EIR will be held before the Planning Commission on Thursday, September 23, 2010 beginning at 1:30 p.m. in City Hall, Room 400. Public comments will be accepted until 5 p.m. on Tuesday, October 19, 2010.

If you would like a CD or hard copy of the Draft EIR, please contact Devyani Jain at 415–575–9051 or Devyani.Jain@sfgov.org, or Chelsea Fordham at 415–575–9071 or Chelsea.Fordham@sfgov.org.


Notice of Availability 

Draft EIR Volume 1

Cover

Title Page

Table of Contents

Executive Summary

Final EIR Request Postcard

 

Draft EIR Volume 2

Cover

Title Page

Table of Contents

1.0 Introduction

2.1 Project Description – Overview

2.2 Project Description – Cathedral Hill Campus

2.3 Project Description – Pacific Campus

2.4 Project Description – California Campus

2.5 Project Description – Davies Campus

2.6 Project Description – St. Luke’s Campus

3.0 Plans and Policies

4.0 Environmental Setting and Impacts

4.1 Land Use and Planning

4.2 Aesthetics

4.3 Population, Employment, and Housing

4.4 Cultural and Paleontological Resources

 

Draft EIR Volume 3

Cover

Title Page

Table of Contents

4.5 Transportation and Circulation

4.6 Noise

4.7 Air Quality

4.8 Greenhouse Gases

4.9 Wind and Shadow

4.10 Recreation

4.11 Public Services

4.12 Utilities and Service Systems

4.13 Biological Resources

4.14 Geology and Soils

 

Draft EIR Volume 4

Cover

Title Page

Table of Contents

4.15 Hydrology and Water Quality

4.16 Hazards and Hazardous Materials

4.17 Mineral and Energy Resources

4.18 Agricultural Resources

5.0 Other CEQA Considerations

6.0 Alternatives

7.0 References

8.0 Report Preparation

Appendix A: NOP

Appendix B: Construction Schedule

Appendix C: Requested Amendments
 

7/21/10 Devyani Jain
575-9051
2009.0335E

1527 Filbert Street and 2559 Van Ness Avenue
Notice of Availability
Preliminary Mitigated Negative Declaration

7/15/10 Monica Pereira
575-9107
2006.0848E 25-35 Dolores Street Residential Project
NOTE: A public hearing on the project’s Draft EIR will be held before the Planning Commission on Thursday, September 2, 2010, at 1:30 p.m. or later in City Hall, Room 400. Public comments will be accepted until 5 p.m. on Tuesday, September 7, 2010. 
Notice of Availability of an EIR
Draft EIR
7/14/10 Chelsea Fordham
575-9071
2007.0903E

Treasure Island and Yerba Buena Island Redevelopment Plan

NOTE: A public hearing on the project’s Draft EIR will be held before the Planning Commission on Thursday, August 12, 2010, at 10 a.m. in City Hall, Room 250 (Board of Supervisors Legislative Chambers). Public comments will be accepted until 5 p.m. on Thursday, August 26, 2010. 

Notice of Availability of a Draft EIR


Draft EIR Volume 1
Cover
Table of Contents
Summary
I. Introduction
II. Project Description
III. Plans and Policies
IV.A. Land Use
IV.B. Aesthetics
IV.C. Population and Housing
IV.D. Cultural Resources
IV.E. Transportation
IV.F. Noise
IV.G. Air Quality
IV.H. Greenhouse Gas Emissions

Draft EIR Volume 2
Cover
Table of Contents
IV.I. Wind and Shadow
IV.J. Recreation
IV.K. Utilities
IV.L. Public Services
IV.M. Biological Resources
IV.N. Geology
IV.O. Hydrology and Water Quality
IV.P. Hazards
IV.Q. Mineral and Energy Resources
IV.R. Agricultural Resources
V. Other CEQA
VI. Variants
VII. Alternatives
VIII. Authors and Persons Consulted
FEIR Request Postcard

Draft EIR Volume 3 - Appendices
Cover
Table of Contents
Appendix A - Notice of Preparation
Appendix B - Public Scoping Report
Appendix C - Transportation Impact Study

Draft EIR Volume 4 - Appendices
Cover
Table of Contents
Appendix D - Noise Calculations
Appendix E - Air Quality Health Risk Assessment
Appendix F - Approach to Greenhouse Gas Emissions
Appendix G - Treasure Island Wind Conditions
Appendix H - Flora of Yerba Buena Island
Appendix I - Final Water Supply Assessment
 

7/12/10 Rick Cooper
575-9027
2006.1106E

222 Second Street
Draft EIR
Comments and Responses
Draft Motion

 

7/8/10 Michael Jacinto
575-9033
2006.0954E SF Enterprise Zone
Notice of Availability and Draft EIR
Comments and Responses
7/1/10 Brett Bollinger
575-9024
2007.1275E San Francisco 2004 and 2009 Housing Element

NOTE: A public hearing on this project’s Draft EIR will be held before the Planning Commission on Thursday, August 5, 2010, in City Hall, Room 400. (Call 558-6422 the week of the hearing for a recorded message giving the time.) Public comments will be accepted until 5:00 p.m. on Monday, August 16, 2010.


DRAFT ENVIRONMENTAL IMPACT REPORT


DRAFT EIR APPENDICES

6/30/10 Jessica Range
575-9018
2006.1506E 749 Wisconsin Street
Notice of Preparation of an Environmental Impact Report and Notice of Availability of an Initial Study
6/30/10 Debra Dwyer
575-9031
2008.1234E 205 Franklin Street
Preliminary Mitigated Negative Declaration
6/22/10 Don Lewis
575-9095
2006.0868E 800 Presidio Avenue, Booker T. Washington Community Center Mixed Use Project
Notice of Availability
Draft EIR
Historic Resources Evaluation Report
Historic Resources Evaluation Report Appendices
Historic Resources Evaluation Response
06/22/10 Michael Jacinto
575-9033
2006.1524E 350 Mission Street
Notice of Preparation of an Environmental Impact Report and Initial Study
6/2/10 Brett Bollinger
575-9024
2004.0557E 1601 Larkin Street Housing Project
Draft Environmental Impact Report
Comments and Responses
Draft Motion
05/27/10 Irene Nishimura
575-9041
2007.0946E Candlestick Point-Hunters Point Shipyard Phase II Development Plan Project (formerly the "Bayview Waterfront Project")

Notice of Availability of a Draft EIR

DRAFT ENVIRONMENTAL IMPACT REPORT

Volume I

Volume II

Volume III

Volume IV

Volume V

Volume VI

COMMENTS AND RESPONSES DOCUMENT

Volume VII

Volume VIII

Volume IX

Volume X

5/13/10 Lisa Gibson
575-9032
2008.0021E Parkmerced Project

Notice of Availability
Draft EIR Part 1
Draft EIR Part 2
Draft EIR Part 3
Draft EIR Appendix A
Draft EIR Appendix B1
Draft EIR Appendix B2
Draft EIR Appendix B3
Draft EIR Appendix B4
Draft EIR Appendix B5
Draft EIR Appendix B6
Draft EIR Appendix B7
Draft EIR Appendix C
Draft EIR Appendix D
 

5/12/10 Rick Cooper
575-9027
2005.1074E

935-965 Market Street Project
Notice of Availability of an Environmental Impact Report and Notice of Public Hearing
Draft Environmental Impact Report
Comments and Responses

5/12/10 Debra Dwyer
575-9031
2008.1075E Mission District Streetscape Plan Project
Revised Notice of Availabiilty
Preliminary Mitigated Negative Declaration
4/28/10 Monica Pereira
575-9107
2008.0081E 950 Mason Street-Fairmont Hotel Revitalization and Residential Tower Project  Draft Environmental Impact Report

Notice of Availability
I. Cover-Summary-Table of Contents
II. Introduction
III. Project Description
IV.A. Land Use
IV.B. Aesthetics
IV.C. Population and Housing
IV.D. Cultural and Paleontological Resources
IV.E. Transportation
IV.F. Noise
IV.G. Air Quality
IV.H. Greenhouse Gas Emissions
IV.I. Wind and Shadow
IV.J. Recreation
IV.K. Utilities and Service Systems
IV.L. Public Services
IV.M. Biological Resources
IV.N. Geology Soils Seismicity
IV.O. Hydrology and Water Quality
IV.P. Hazards and Hazardous Materials
IV.Q. Minerals and Energy Resources
IV.R. Agriculture and Forest Resources
V. Other CEQA Issues
VI. Alternatives to the Project
VII. EIR Preparers and Organizations

4/28/10 Devyani Jain
575-9051
2005.0869E 121 Golden Gate Avenue
Notice of Preparation of an Environmental Impact Report
4/14/10 Jeanie Poling
575-9072
2010.0195E India Basin Shoreline Redevelopment Program
Notice of Availability and Notice of Public Scoping Meeting
Notice of Preparation of an Environmental Impact Report
3/23/10 Stanley Muraoka
749-2577
2004.0946E 1717 17th Street
Preliminary Mititgated Negative Declaration
3/10/10 Jessica Range
575-9018
2009.0112E One Capitol Ave.
Final Mitigated Negative Declaration
3/8/10 Jeremy Battis
575-9022
2005.1085E 555 Fulton Street
Preliminary Mitigated Negative Declaration
3/3/10 Michael Jacinto
575-9033
2007.1457E 1050 Valencia Street
Preliminary Mitigated Negative Declaration
2/10/10 Jeremy Battis
575-9022
2007.0463E 4199 Mission Street
Notice of Availability and Preliminary Mitigated Negative Declaration
1/13/10 Andrea Contreras
575-9044
2005.1004E Glen Park Community Plan
Notice of Availability of an Initial Study
Initial Study
Notice of Preparation of an Environmental Impact Report
1/06/10 Lisa Gibson
575-9032
2009.0418E Pier 36/Brannan Street Wharf
Notice of Preparation of an Environmental Impact Report
12/22/09 Chelsea Fordham
575-9071
2007.0211E 740 Washington Street
Notice of Preparation of an Environmental Impact Report
12/16/09 Jeremy Battis
575-9022
2007.0519E 1645 Pacific Avenue
Notice of Availability
Draft EIR
11/18/09 Brett Bollinger
575-9024
2009.0568E City and County of San Francisco Auxiliary Water Supply System Seismic Upgrade
Notice of Availability and Preliminary Mitigated Negative Declaration
10/28/09 Irene Nishimura
575-9041
2008.0680E Port Prop A Open Space Improvements
Notice of Availability and Preliminary Mitigated Negative Declaration
10/07/09 Don Lewis
575-9095
2008.0877E Western SoMa Community Plan
Notice of Preparation of an Environmental Impact Report and Notice of Public Scoping Meeting
8/11/09 Paul Lord
558-6311
2008.0395E 2130 Fulton Street/ University of San Francisco Center for Science and Innovation
Preliminary Mitigated Negative Declaration
7/29/09 Irene Nishimura
575-9041
2007.0689E

900 Folsom Street
Draft Environmental Impact Report
Comments and Responses


7/29/09
5/6/10

Brett Bollinger
575-9024
2007.0690E 260 Fifth Street
Draft Environmental Impact Report
Comments and Responses


7/29/09
5/6/10

Brett Bollinger
575-9024
2006.1073E The Exploratorium Relocation Project
Final Environmental Impact Report
7/9/09 Viktoriya Wise
575-9049
2007.0347E

San Francisco Bicycle Plan
Final EIR Volume 1
Final EIR Volume 2
Final EIR Volume 3
Final EIR Appendix A
Final EIR Appendix B
Final EIR Appendix C
Final EIR Appendices D&E
Final EIR Appendix F

6/24/09 Debra Dwyer
575-9031
2008.0197E 942 Mission Street
Notice of Availability and Preliminary Mitigated Negative Declaration
6/3/09 Andrea Contreras
575-9044

2008.0968E

North Beach Branch Library & Joe DiMaggio Playground Master Plan Project
Notice of Preparation of an Environmental Impact Report and Initial Study

4/29/09

Michael Jacinto
575-9033

2005.1912E Natural Areas Management Plan
Notice of Preparation of an Environmental Impact Report
NOP Appendices Part 1
NOP Appendices Part 2
4/22/09 Jessica Range
575-9018
2005.0979E Fox Plaza Expansion Project
Notice of Availability and Preliminary Mitigated Negative Declaration
04/08/2009 Don Lewis
575-9095
2006.0422E Executive Park Subarea Plan Amendments to the General Plan, Planning Code, and Zoning Map
Notice of Availability and Initial Study
Notice of Preparation of an Environmental Impact Report and Notice of Public Scoping Meeting
02/11/2009 Devyani Jain
575-9051
2005.0408E 2290-2298 Third Street Residential-Retail Project
Notice of Availability and Notice of Preparation of an Environmental Impact Report
02/11/2009

Jeremy Battis
575-9022

2008.0081E 950 Mason - Fairmont Hotel Revitalization and Residential Tower Project
Notice of Availability
Notice of Preparation of an Environmental Impact Report
01/21/2009 Devyani Jain
575-9051
2004.0764E 1634-1690 Pine Street Mixed-Use Project
Draft EIR Part 1
Draft EIR Part 2
12/31/2008 Irene Nishimura
575-9041
2007.0519E 1645 Pacific Avenue
Notice of Preparation of an Environmental Impact Report
10/01/2008 Brett Bollinger
575-9024
2006.0144E 651 Dolores Street (Second Church of Christ, Scientist)
Draft EIR
10/01/2008 Brett Bollinger
575-9024
2006.1294E 110 The Embarcadero Project
Preliminary Mitigated Negative Declaration
09/12/2008 Don Lewis
575-9095
2007.0558E/
2008.0789E
Transit Center District Plan and Transit Tower
Notice of Preparation of an Environmental Impact Report
07/18/2008 Sarah Jones
575-9034
2007.0206E Sutro Tower Digital Television Project
Draft EIR
Comments and Responses
10/02/2008 Viktoriya Wise
575-9049
2007.0603E San Francisco General Hospital Seismic Compliance and Hospital Replacement Program
Notice of Availability of a Draft EIR
Draft EIR Part 1 (TOC, Intro, Summary, Project Description)
Draft EIR Part 2 (Env Setting Impacts Plans and Policies, Land Use, Population and Housing)
Draft EIR Part 3 (Env Setting Impacts Visual, Shadow, Wind, Cultural)
Draft EIR Part 4 (Env Setting Impacts Transp, Noise, Air Quality)
Draft EIR Part 5 (Env Setting Impacts Utilities, PubSrvcs, Geo, Hydrology, Haz, Other Topics)
Draft EIR Part 6 (Mitigation, Other CEQA, Alts, Refs, DistList, Authors)
Draft EIR Appendix A(NOP of EIR)
Draft EIR Appendix B
Draft EIR Comments & Responses
06/04/08 Devyani Jain
575-9051
2005.0142E 733 27th Avenue
Preliminary Mitigated Negative Declaration
02/16/08 Brett Bollinger
575-9024
2006.0608E 445 Wawona Street
Preliminary Mitigated Negative Declaration
02/02/08 Brett Bollinger
575-9024
2003.0527E 1000 16th Street Mixed-Use Project
Draft Environmental Impact Report
01/26/08 Michael Jacinto
575-9033
2006.0460E

690 Stanyan Street (Mixed Residential/Retail Project)
Draft Environmental Impact Report
Comments and Responses
C&R's Appendices

10/02/08 Sarah Jones
575-9034
2007.0030E 8 Washington Street
Notice of Preparation of an Environmental Impact Report
12/08/07 Nannie Turrell
575-9047
2005.0893E 1650 Broadway
Preliminary Mitigated Negative Declaration
10/06/07 Brett Bollinger
575-9024
2005.0694E New Mission Theater Mixed Use Project
Notice of Preparation of an Environmental Impact Report
08/11/07 Sarah Jones
575-9034
2004.0588E 255 Seventh Street Project
Draft Environmental Impact Report
02/24/07 Viktoriya Wise
575-9049

TopPlanning home

 
Last updated: 7/30/2010 11:14:19 AM